WENexus

Pilot Projects

Within the scope of the Pilot Projects, the Consortium Partners provide
free support to water supply and/or wastewater management utilities operating in Portugal,
interested in making investments to improve the energy efficiency of their systems.

 

 

In September 2024, a cooperation protocol was established between WENexus and Infraquinta, E.M., which sets out the scope of the Pilot Projects to be developed with this management utility and the support to be provided by the WENexus team.

Learn more

The Pilot Projects in development with Infraquinta, E.M., corresponds to:

Vector 1 – Electromechanical Equipment:

  • Pumps replacement at water pumping station;

Vector 2 – Photovoltaic Panels:

  • Photovoltaic panels installation at water supply infrastructures; 

Vector 3 – Storage Batteries:

  • Batteries installation at water supply infrastructures.

In July 2024, a cooperation protocol was established between WENexus and Be Water, which sets out the scope of the Pilot Projects to be developed with this management utility and the support to be provided by the WENexus team.

Learn more

The Pilot Projects in development with Be Water corresponds to:

Vector 1 – Electromechanical Equipment:  

  • Pumps replacement at wastewater infrastructures;

Vector 2 – Photovoltaic Panels:

  • Photovoltaic panels installation at wastewater infrastructures.

INDAQUA is yet another management utility joining the WENexus project. The cooperation protocol which sets out the scope of the Pilot Projects and the support to be provided by the WENexus team was signed in July 2024.

Learn more

The Pilot Projects in development with INDAQUA corresponds to:

Vector 2 – Photovoltaic Panels:

  • Photovoltaic panels installation at water and wastewater infrastructures.

In July 2024, a cooperation protocol was established between WENexus and Inframoura – Empresa de Infraestruturas de Vilamoura, E.M., which sets out the scope of the Pilot Projects to be developed with this management utility and the support to be provided by the WENexus team.

Learn more

The Pilot Projects in development with Inframoura corresponds to:

Vector 1 – Electromechanical Equipment:

  • Pumps replacement at water supply pumping stations;

Vector 3 – Storage Batteries:

  • Storage Batteries installation at water supply pumping stations.

In May 2024, a cooperation protocol was established between WENexus and Águas do Ribatejo, which sets out the scope of the Pilot Projects to be developed with this management utility and the support to be provided by the WENexus team.

Learn more

The Pilot Projects in development with Águas do Ribatejo corresponds to:

Vector 1 – Electromechanical Equipment:  

  • Pumps replacement at wastewater pumping stations;

Vector 2 – Photovoltaic Panels:

  • Photovoltaic panels installation at water and wastewater infrastructures.

In March 2024, a cooperation protocol was established between WENexus and Águas do Algarve, which sets out the scope of the Pilot Projects to be developed with this management utility and the support to be provided by the WENexus team.

Learn more

The Pilot Projects in development with Águas do Algarve corresponds to:

Vector 1 – Electromechanical Equipment:

  • Sand filters wash water pumps replacement at water treatment plant;   
  • Pumps and variable speed drivers replacement at water pumping stations;   
  • Installation of variable speed drives at water pumping stations.